Installation Works of Light Fuel Pumping Station in Misurata Storehouse
completed
General Information
-
Responsible Department :
-
● Oil and Gas
Scope of work
A light fuel pumping system has been installed at the Misurata Oil Depot to carry out light fuel through a 12-inch pipeline along a distance of approximately 6 K.M to Misurata Power Plant combined cycle. The new pumping station contains two multistage centrifugal pumps, with a capacity of around 300 cubic meters per an hour of each pump.