Skip to main content

GESCO Projects and Activities

Construction of light fuel tank No. (1) at Zueitina gas station

completed

General Information

  • Responsible Department :
  • ● Oil and Gas
  • Location:
    Zouitina

Scope of work

Light fuel tank No. (1) in the Zueitina station, with a capacity of 15,000 cubic meters, which is used to store fuel for the current and new gas turbines (2 x 285 megawatts) in the station. From the tank structure and the collapse of its roof and damage to its equipment and accessories such as pipes, fire fighting systems, measuring systems, etc., the damage reached even the protective concrete wall of it. And based on the agreement between the General Electricity Company and the International Electricity Services Company, the company assumed the task of removing the damaged fuel tank and installing a new one with the same specifications. New, run tests and then delivery.
GESCO

The Global Electricity Services Company was established in 2001 with the aim of meeting the growing need in the energy sector, as the company’s scope of work includes the construction and maintenance of stations, water station analysis, and oil and gas projects.


© All rights reserved GESCO © 2022