A site visit to the proposed location for the solar power plant project with a capacity of 1 MW in Tawergha was conducted, This project is to assist in covering loads and connecting the solar power plant with the public power grid.
The engineers from the General Electricity Company Of Libya, the Global Electricity Services Company, and the Renewable Energies Authority all participated in and oversaw the visit.
Leave a Reply