Maintenance of Sea Water Inlet at North Benghazi Steam Power Station
completed
General Information
-
Responsible Department :
-
● Water Treatment
-
Category:Steam generation power plants
-
Location:Benghazi
Scope of work
The maintenance of the seawater inlet to the North Benghazi station included the preparation and maintenance of (4) seawater filters, maintenance of filters No. 1 and filter No. 2, temporary maintenance to ensure their continuity of operation, maintenance of filters No. 1 and filter No. 2 and their introduction into service, starting to dismantle filter No. 3 and filter No. 4 During the supply period, maintenance of refinery No. 3 and refinery No. 4 and their introduction into service, and maintenance of (2) bridges Maintenance of bridge No. 1 Maintenance of bridge No. 2 The maintenance process was carried out in two phases, in the first phase quick and temporary maintenance of 2 filters (TBS 1 & 2 ) with operation monitoring to ensure the flow of seawater to the station’s systems without interruption, in the second phase, spare parts were supplied and the installation of filters (TBS 3&4) began with operation monitoring to ensure the flow of seawater to the station’s systems.