Fuel and Gas Pipeline Supply, Installation, and Commissioning at Misurata Power Plant
completed
General Information
-
Responsible Department :
-
● Oil and Gas
-
Location:Misratah
Scope of work
The project has included the services of Supply, installation, testing, and commissioning of a 12 inch / 24 inch pipeline to transfer the fuel required for the power units at Misurata power plant.