Maintenance of Obari Gas Power Plant

completed

General Information

  • Responsible Department :
  • ● Power Plants
  • Location:
    Aubari

Scope of work

Global Electricity Services Company supervised the maintenance of several works of the Obari gas power plant, including: – Close the cable rooms after detection – Working on installing the raw fuel bit pump for the first and second units – PCC – Installation of ventilation systems for rooms – Firefighting system repair works – Work on assembling materials to extract the foam tank – Foam tank filling work – Complete the inspection of the fire extinguishing system in full – Conducting operational tests for a transformer (75K/220KV) – Chemistry lab cleaning work – CTG Unit Builder Cleaning Works – Laying and connecting the cables between the transformer and gears – Conducting an insulation test to prevent gas leakage – 200 FM from the specified area – Cleaning and monitoring of fuel leakage in the unit during the unit operational tests
GESCO

The Global Electricity Services Company was established in 2001 with the aim of meeting the growing need in the energy sector, as the company’s scope of work includes the construction and maintenance of stations, water station analysis, and oil and gas projects.


© All rights reserved GESCO