Skip to main content

GESCO Projects and Activities

Construction of a water treatment plant

completed

General Information

  • Responsible Department :
  • ● Water Treatment
  • Location:
    ِAlsarir

Scope of work

A water treatment plant was established in an area in Al- Sarir station, consisting of (3) stages: First: collecting seawater inside one tank with a capacity of (3215 cubic meters). Tania: Starting the process of treating and separating the water using reverse osmosis, which was collected in a tank with a capacity of (141 cubic meters). Third: The final treatment stage, which consists in removing the minerals in the water and then collecting them in a tank with a capacity of (421 cubic meters).
GESCO

The Global Electricity Services Company was established in 2001 with the aim of meeting the growing need in the energy sector, as the company’s scope of work includes the construction and maintenance of stations, water station analysis, and oil and gas projects.


© All rights reserved GESCO