GESCO Projects and Activities
Construction of a water treatment plant
completed
General Information
-
Responsible Department :
-
● Water Treatment
-
Location:ِAlsarir
Scope of work
A water treatment plant was established in an area in Al- Sarir station, consisting of (3) stages:
First: collecting seawater inside one tank with a capacity of (3215 cubic meters).
Tania: Starting the process of treating and separating the water using reverse osmosis, which was collected in a tank with a capacity of (141 cubic meters).
Third: The final treatment stage, which consists in removing the minerals in the water and then collecting them in a tank with a capacity of (421 cubic meters).